For full functionality of this site it is necessary to enable JavaScript. Here are the instructions how to enable JavaScript in your web browser.

Concrete placed against an existing concrete surface: the modification of the requirements for cover to the reinforcement

Eurocode 2 part 2: Design of concrete bridge structures   4.4.1.2 (109)

Recommendation

The cover needs only satisfy the requirements for bonds (see EN 1992-1-1, § 4.4.1.2 (3)), provided the following conditions are met :

  • the existing concrete surface has not been subject to an outdoor environment for more than 28 days
  • the existing concrete surface is rough
  • the strength class of the existing concrete is at least C25/30.

National choice

the requirements
...
...